aerospace

Boeing Overhead Cranes

The goal of this project is to investigate the feasibility of integrating an improved crane operating system into Boeing’s Everett facility to strive towards a safer and more efficient system. The current cab-operated crane system poses risks of injury to operators which may lead to decreased productivity and increased worker costs.

Raytheon Production Process Improvement

The purpose of this project was to design, build, and test simulation models of Raytheon’s radar manufacturing process. The models include the current state as well as future states that could potentially improve the current process. The simulation will be used at Raytheon by our project sponsor, Ed Martinez, as a tool to analyze potential production changes.